Monday, August 13, 2007

August already....


Well here it is the middle of August. We have been enjoying the summer here in Vermont spending a lot of time out on the lake boating and swimming. Jess spends everyday over at the house site plugging away. Right now the plumbing is happening, and when that is finished the next thing is insulation, then sheetrock. Jess has ordered the siding for the house, and that should arrive tomorrow. Tonight we went and looked at appliances, although we're a long way off from actually needing them. The excavators will be back soon to put in the septic system. We have water to the house now, and Jess washed his truck there the other day. We're going to wait until we get the water tested before we start drinking it. So, as always, things are moving along. Here are some photos of 199 Coyote Run.


the water pump



a beautiful summer day in VT

The finished eave sofit

Jess working in the master bedroom

bulkhead doors into the basement

Job site doggie, fast asleep, with a table saw going full tilt only six feet away.

No comments: