It seemed like for a long time not much was changing about the house. I have to say that I didn't have much enthusiasm towards posting new blog entries. But things are looking different over at 199 Coyote Run lately, and it's about time we updated everyone on the latest progress. Now there is siding on some of the house, the roof is complete, one of the first floor decks now has decking, the plumbing, heating, and electrical are completely roughed in, and today the insulation guys showed up. The balcony is also done, in fact, I enjoyed a very nice sunset from it tonight. The property has also been graded, seeded, and covered with hay. We did that a few weeks ago, in the course of two days 200 bales of hay got spread over the property to cover all of the grass seed that was put down. I'll let the photos speak for themselves.
That's the front entry, and the side of the garage to the left. The siding is a cement product, and came pre-painted.
The balcony had to be dealt with just like it was a roof because there is a covered deck below. The decking sits on top of a floating frame that is glued to a waterproof membrane that covers the whole deck. The balcony is sloped, and has drains that run out of the floor and down the columns on the deck below.
That's the brain of the heating and plumbing system for the house.
Insulation in Miranda's room.
The balcony
This is the radiant floor heating tubing. It was my job to staple all of those aluminum plates onto the subfloor.
Another beautiful sunset over our future home.
1 comment:
Holy cow! It's starting to look like a real house. Looks great!
Post a Comment